Training, Consultation & General services Company
  • (+20) 25215059 / (+2) 01118867769
    info@coreqhse.com

  • Maadi, Cairo – Egypt
    1st Floor, 15 Road 256

  • Working Hours
    From 08:00 am to 16:00 pm

Advanced production optimization

Course Purposes

This course is designed to give attendees an overview of various artificial lift solutions and related production optimization concepts. Predict the rate at which a well should be capable of producing, given reservoir and fluid properties, wellbore configuration, and flowing wellhead pressure. Identify which components of the reservoir/completion/wellbore system are restricting performance; analyze production data to find permeability, skin factor, and drainage area; forecast future performance from historical production trends and from known reservoir properties.

Course Objectives:

  •   To improve understanding and awareness of equipment operation and correct procedures of work-over operations.
  •   To increase individuals knowledge and confidence of problems, and production optimization.

Course Contents

  •   Inflow performance - oil wells
  •   Darcy's Law – pseudo steady state flow
  •   Votel's IPR, Dietz shape factors
  •   Gas wells, Rawlins & Schelhardt
  •   Transient IPR curves
  •   Nodal & well orientations
  •   Pressure drop across the completion
  •   Partial penetration
  •   Deviated wells
  •   Hydraulically fractured wells
  •   Perforated completions
  •   Gravel-pack completions
  •   Multiphase flow in tubing
  •   Liquid holdup
  •   Flow regimes
  •   Critical rate to lift liquids
  •   Useful correlations in nodal analysis
  •   Systems analysis graph
  •   Reservoir & completion
  •   Tubing performance
  •   Choice of node location
  •  Surface wellhead chokes
  •   Subsurface safety valves
  •   Production data analysis
  •   Conventional decline curve analysis
  •   Exponential; harmonic and hyperbolic decline
  •   Estimating skin factor and permeability from transient flow
  •   Estimating drainage area from pseudo steady state flow
  •   History matching production data
  • Forecasting future performance 

Course Recipients

This course is suited for
 
  •   Reservoir and production engineers involved in improving field performance through identification and remediation of underperforming wells

Duration

5 Days

Methodology of teaching

Classroom lectures and exercises

Certificates

Core Certificate

Available DATE

Duration Start End
5 Days 2018-02-04 2018-02-08 Apply



5 Days 2018-04-15 2018-04-19 Apply



5 Days 2018-07-22 2018-07-26 Apply



5 Days 2018-09-23 2018-09-27 Apply



5 Days 2018-12-09 2018-12-13 Apply




Remember me Forgot password?