Training, Consultation & General services Company
  • (+20) 25215059 / (+2) 01118867769
    info@coreqhse.com

  • Maadi, Cairo – Egypt
    1st Floor, 15 Road 256

  • Working Hours
    From 08:00 am to 16:00 pm

Stripping Operation & Volumetric Method

Course Purposes

This course will discuss some practical stand points of the stripping operation with and without volumetric control. Additionally, this will summarize some key points for both methods of stripping for off bottom well control.

Course Objectives:

By the end of this course the participant will be able to
 
  • learn detailed well control procedures including volumetric and stripping methods and bullheading
  • Learn to produce annular pressure profiles and deal with equipment failure.Other topics include:
  • horizontal well control, correcting kick graphs
  • HPHT wells considerations
  • well control during casing and cementing and well barriers.

 

Course Contents

  •   INTRODUCTION.
  •   CAUSES OF OFF-BOTTOM KICKS.
  •   SHUT IN PROCEDURE  AND TRIP DRILL.
  •   OVERVIEW OF STRIPPING OPERATION.
  •   DANGERS OF OFF-BOTTOM KILLS.
  •   PLANNING THE STRIPPING OPERATION.
  •   COMBINED STRIPPING AND VOLUMETRIC METHOD OVERVIEW.
  •   COMBINED STRIPPING AND VOLUMETRIC PROCEDURE.
  • TYPICAL WORK INSTRUCTIONS

Course Recipients

  This course is suited for

 

  • drilling Engineers
  • Drilling Supervisors
  • Rig Managers and Toolpushers
  • Some wellsite or operations experience and a basic knowledge of well control equipment are beneficial for this course

Duration

3 Days

Methodology of teaching

Classroom lectures & Videos

Certificates

Core Certificate

Available DATE

Duration Start End
3 Days 2018-01-22 2018-01-24 Apply



3 Days 2018-03-20 2018-03-22 Apply



3 Days 2018-08-13 2018-08-15 Apply



3 Days 2018-09-11 2018-09-13 Apply



3 Days 2018-11-12 2018-11-14 Apply




Remember me Forgot password?